Toluene
y-BHC
Chlordane 4,4'-DDE 4,4'-DDD
Chlordane 4,4'-DDE 4,4'-DDD
a-Endosulfan ß-Endosulfan
Endosulfan sulfate
Heptachlor
Isophorone
Figure 7.3.1 shows the components of a comprehensive industrial wastewater survey. The two main elements in a survey are (1) definition of the physical characteristics of the plant's sewer systems and (2) development of individual wastewater stream profiles. Defining the physical systems is required before information on flow characteris-
BPT Effluent Limitations
Average of daily values
Pollutant for 30
or consecutive pollutant Maximum for days shall not property any 1 day exceed
Was this article helpful? |
Post a comment