Table 10105 Operating Costs Of Fluidizedbed Sludge Incineration With And Without Heat Recovery

Items

Utility Unit Cost

Normal Undried Cake Incineration

Amount

Cost

Newly Developed Indirectly Dried Cake Incineration

Amount

Cost

Plant Capacity Operation Cost

1. Supporting fuel

2. Electricity

3. Chemical (NaOH)

4. Lubrications Total per Day

Unit Treatment Cost per Input Cake Vol.

80 tn/d

6360 l/d 10800 kWh/d 220 kg/d

US$/d 2226 1080 77

0 0

Post a comment