Table 7531 Estimated Marine Disposal For 1968

Type of Waste

Pacific Coast

Atlantic Coast

Gulf Coast

Total

Percent of Total Tonnage Cost

Annual Tonnage

Estimated Cost, $

Annual Tonnage

Estimated Cost, $

Annual Tonnage

Estimated Cost, $

Annual Tonnage

Estimated Cost, $

Dredging spoils

7,320,000

3,175,000

15,808,000a

8,608,000

15,300,000

3,800,000

38,428,000

15,583,000

80%

53%

Industrial

0 0

Post a comment